Confirm which assemblies belong in the inventory
Reconcile life safety drawings, door schedules, prior inspection files, project closeout documents, labels, barrier types, and representative field conditions. Assign a stable identifier to each assembly and record building, floor, opening location, barrier relationship, door type, and known rating information. Do not rely on an old contractor list without checking additions, removals, renovations, and duplicate identifiers.134
Organize access and operational coordination
Identify patient-care restrictions, behavioral-health precautions, security-controlled openings, isolation rooms, operating departments, and doors that require escorts or scheduled access. Coordinate alarm, hold-open, and release testing with authorized staff. The inspection plan should protect patients and operations while still allowing the complete assembly and required functions to be evaluated.718
Collect prior records without hiding open deficiencies
Provide the current inventory, prior inspection result, repair history, field modification documentation, and open work. Keep unresolved deficiencies visible and distinguish a repair invoice from verified closure. Missing labels, altered hardware, clearance problems, non-latching leaves, blocked operation, and damaged components may require different evidence and different qualified parties.146
Agree on the inspection and finding format
The record should identify the assembly, inspection date, inspector, observed result, deficiency description, photographs where permitted, and follow-up status. Establish terminology and severity rules before fieldwork so the resulting worklist can be sorted by location, condition, responsible trade, and operational risk. Preserve uncertainty when rating, listing, or field-modification information requires further verification.124
Prepare correction and reinspection pathways
Define who can authorize repair, how listing and manufacturer information will be checked, when field labeling or design review may be needed, and who verifies the completed assembly. Trend repeated failure modes by door type, building, installer, and cause. A strong annual program uses inspection results to improve preventive maintenance, staff practices, procurement, and construction turnover throughout the year.178
Prepare staff and the building for functional inspection
Tell affected departments when inspectors will arrive and why doors must remain in normal service unless an approved test step requires coordination. Remove ordinary obstructions without concealing unresolved conditions, and ensure that authorized staff are available for alarm-released, security-controlled, or powered assemblies. Provide safe access to labels, hardware, and both sides of each opening.
Do not pre-adjust an assembly merely to produce a passing result unless the maintenance action and verification are documented honestly. The goal is an accurate assessment of the managed door population. Known failed or impaired openings should remain in the corrective-action process with required interim protection rather than disappearing from the inspection record.145
Evaluate the annual program between inspection dates
Use work-order history, trouble calls, construction activity, patient equipment impacts, hold-open practices, and recurring clearance or latching failures to identify doors needing attention before the next annual cycle. Train staff to report damaged hardware, blocked swing, unauthorized wedges, loose components, and changes that can affect the complete listed assembly.
Reconcile completed repairs to the inventory and preserve documentation for parts, field modifications, labels, and verification. Periodically sample closed deficiencies in the field. A reliable program demonstrates that failures are detected and controlled throughout the year, not only that an inspection vendor produced a report on one date.178
Confirm the inspection is ready to proceed
Before the first opening is inspected, confirm the current inventory, building access, normal door operation, approved testing coordination, inspector qualifications, finding terminology, required report fields, and escalation method for an immediate concern. Identify how inaccessible or unverified assemblies will remain open for follow-up. Confirm that repair vendors and facility reviewers understand that inspection, repair authorization, and verified closure are separate steps. This final readiness check protects the integrity of the annual record and makes the resulting worklist usable by operations.148